[1]
Hartono, R. 2025. MPC-Bayesian Process Control Optimization for Continuous Chemical Plant with Load Variability and Time Delay. Journal of Electrical Engineering. 3, 03 (Sep. 2025), 100–107. DOI:https://doi.org/10.54209/elimensi.v3i03.413.