Hartono, R. (2025). MPC-Bayesian Process Control Optimization for Continuous Chemical Plant with Load Variability and Time Delay. Journal of Electrical Engineering, 3(03), 100–107. https://doi.org/10.54209/elimensi.v3i03.413