Hartono, R. “MPC-Bayesian Process Control Optimization for Continuous Chemical Plant With Load Variability and Time Delay”. Journal of Electrical Engineering, vol. 3, no. 03, Sept. 2025, pp. 100-7, doi:10.54209/elimensi.v3i03.413.